Press Centre

SS 750 kV “Kalyuzhskaya”, Moscow, Russia

The project SS 750 kV has successfully finished. The subcontractor “Promont” was responsible for terminations 500 kV installation and for the cable laying 220 kV and 500 kV supervision. Cable line was tested and in the operation mode currently pictures.